TÜV Rheinland - E3
TÜV Rheinland - E3

You are here: E3 - Energy Expertise Everywhere / Solar / Comprehensive Certificate for Ichigo Kiryu Okuzawa ECO Power Plant

Comprehensive Certificate for Ichigo Kiryu Okuzawa ECO

  • Comprehensive certification of photovoltaic plants is already widespread in Europe, and this type of inspection by a third-party agency is expected to grow in number and enhance the credibility of solar plants in Japan in the coming years. Ichigo ECO’s Kiryu plant is the second in Japan to have obtained a comprehensive certification.

    Basic facts

    ClientIchigo ECO Energy Co., Ltd
    Timeframe09/2013 – 06/2014
    Project locationOkuzawa-aza, Nikko, Niisato-cho, Kiryu, Gunma Prefecture, Japan
    Main services
    Involved regulations/ standards
    • International Standard IEC 62446
    • JIS and JEMA regulations  for Japanese market

    Initial situation and requirements

    In the evaluation of solar energy power plants, TÜV Rheinland has many years of experience dealing with international solar plant systems standards IEC 62446 as well as domestic JIS and JEMA standards. By allowing inspections on-site and from the stage of plant construction until the pre-operational period by a neutral third-party inspection agency, Ichigo ECO can increase the reliability, performance quality, and safety of its solar plants. Japanese inspectors with experience in solar power run the inspections and evaluations to quickly respond to domestic certification services.

    Solutions, results

    • Evaluation of operation and long-term reliability of investment required for Photovoltaic Power Plants.
    • Certification of photovoltaic power plant with 1.33 megawatt output.



  • 1. Technical evaluation from a neutral and independent position is performed at every stage:

    • stage 1: planning and installation,
    • stage 2: from installation to operation,
    • stage 3: throughout plant operation.

    2.  A highly accurate energy yield prediction is conducted, including an on-site shadowing analysis*. Further the project specification is investigated towards completeness and correctness.

    3.  Before the photovoltaic modules are installed on-site, output measurement is performed at TÜV Rheinland Japan's photovoltaic laboratory to ensure the performance.

    4.  After mechanical completion, a comprehensive on-site inspection with full testing ensures the quality and safety of the plant construction.

    Benefits for the client

    TÜV Rheinland’s comprehensive certification for photovoltaic power plants offers the following benefits to plant operators, financial institutions, insurance companies, and investors:

    • Power plant operators: Minimized safety risks from a technical standpoint
    • Financial institutions and investors: Improved bankability and ROI

    Need more information? Do not hesitate to contact us!

    TÜV Rheinland Japan Ltd.
    Solar Energy Assessment Center (SEAC)
    4-5-24 Chigasaki-Higashi, Tsuzuki-ku, Yokohama

    Phone: 045-271-3508
    Fax: 045-271-3525
    Get in contact
    Web: www.tuv.com